<progress id="171vx"></progress>

<thead id="171vx"><font id="171vx"><listing id="171vx"></listing></font></thead>
<track id="171vx"></track>
<noframes id="171vx"><thead id="171vx"></thead>
<sub id="171vx"><th id="171vx"><form id="171vx"></form></th></sub>

<track id="171vx"><sub id="171vx"></sub></track>

      <ins id="171vx"><track id="171vx"></track></ins>
        <big id="171vx"><strike id="171vx"></strike></big>

        <listing id="171vx"><address id="171vx"></address></listing>

        print this page email this page go to the top of the page
        Home
        Contact Us
        Sitemap
        Projects Executed
        ISIS Clinic
        Client:
        ISIS Medical Holdings Ltd. - Dr. Andreas Mavrides
        Architect:
        Minas Zanettos
        Duration: 9 months
        Commencement Date: January 2008
        Completion Date: October 2008
        Details
        The Project consisted of the complete renovation internally and externally of the ISIS Clinic in Ioannis Clerides Street, Nicosia.  The works included demolition of internal walls, doors, windows and ceilings and recreating the interior of the building, electrical and mechanical installations and the erection of a new dome on the ground floor.
        Back to Projects Executed
        © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio